The quality team rebuilt the lot record from four systems.
- Production places the hold
- The team finds the records
- The team checks the evidence
- Staff track system updates
Case study · Defense manufacturing
Carric connected four systems so the quality team can assemble each held lot’s records and track the quality manager’s decision through confirmed system updates.
The operating constraint
The client is an advanced defense manufacturer with three production sites. Four systems held the records needed to review a production hold. MES held the work order and lot, while PLM held the current manufacturing traveler. QMS held inspection and material records, and ERP held the delivery date.
The quality team searched each system, checked the current revision and identified any missing evidence. It then assembled a record for the quality manager to review. After the decision, system updates required manual follow-up.
What changed operationally
The quality team now reviews one record that links the lot evidence to the approved decision. MES and ERP confirmations show that the systems received the changes. This gives each plant a record of both the authorization and its execution.
Records from all four systems are available together. The quality team can check which revision and supporting evidence informed the decision.
The production control team manages open holds. The quality manager decides the action for each lot.
Both systems confirm the changes before the record closes. The team can trace the approved action through to its execution.

Downloadable case study
The illustrated guide shows the screens used to review lot evidence, record the quality manager’s decision and check system updates.
A similar operating pattern
Bring a recurring production hold and the systems your team uses to review it. Carric will help assess how the evidence, decision and system confirmations connect.